LEAD AZIDE DETONATION — PLUME & DEPOSITION MODEL

Iowa Army Ammunition Plant, Middletown IA · Wed Nov 25 2026, ~09:00 CST · 68 barrels ≈ 9,500 lb (4,309 kg)
NE wind 4.5 m/sgusts 8 m/sstable BL, CAPE 0plume → SW
Lead deposition (µg/ft²)
0.11540100400+
— — 5 µg/ft² EPA floor contour
— — 100 µg/ft² windowsill contour
Independent estimate — not an official product. Site: 40.8741 N, 91.2626 W. Total material 4,309 kg Pb(N₃)₂ → max 3,068 kg elemental Pb; only the aerosolized fraction (slider) disperses. Deposition grid 300 m. Forecast: Open-Meteo (ECMWF/ICON blend) pulled Nov 23. Army reference values from Nov 24 release: 100 µg/ft² over 27 mi², 5 µg/ft² over 148 mi², airborne transport 8+ h to NE Missouri. Leaflet © OpenStreetMap contributors.